Deployment and operation

Acceptance criteria

Function Every task type runs; the upper-system interface works; every safety function is effective.
Accuracy Navigation, parking and docking accuracy, each measured at defined points.
Success rate Docking success rate and task completion rate.
Cycle Time per task per machine, and system throughput.
Stability Exceptions over a period of continuous running, and mean time between failures.

Acceptance criteria should be measurable numbers written into the technical agreement; each item is tested at acceptance and the test data handed over on the day. The preconditions belong in writing too: modifications complete, network to specification, carriers compliant and third-party interfaces available, and what happens to acceptance if they are not.

Need the full engineering documents?

Site survey forms, recommended spare parts lists by model and battery transport documents are provided for each project. Tell us the model and the site, and we will send the latest version.

Request documents

SEE ALSO

Robot projects: survey to acceptance →  ·  Send your site conditions