Jiangsong Robot
Get a quote

Sizing and specification

What a survey must bring back

Load carriers Dimensions of pallets, racks and totes; whether the bottom is open or closed; material and colour.
Materials Unit weight, full-load weight (always full, or only occasionally heavy) and centre of gravity.
Site Indoor or outdoor; floor material, flatness, gaps, steps and slopes; wireless network coverage.
Aisles Narrowest width, turning space, doorways, clear height, and whether people and vehicles share the aisles.
Throughput Trips per hour, number of shifts and one-way distance.
Stations Number, location and height of pick-up and drop-off points, and whether they connect to equipment.
Systems Whether MES or WMS integration is needed, and who provides the interface.
Ancillaries Automatic or manual charging; whether doors and lifts need to be linked; whether call buttons are needed.
Special requirements Cleanliness, explosion protection, low temperature, dust, static electricity and accuracy.

Need the full engineering documents?

Site survey forms, recommended spare parts lists by model and battery transport documents are provided for each project. Tell us the model and the site, and we will send the latest version.

Request documents

SEE ALSO

All six handling series →  ·  Send your site conditions