Sizing and specification

How many chargers

Chargers = fleet × daily charging hours per machine ÷ available charging hours × a redundancy factor. In practice a rule of thumb is used: one charger per four machines on one shift, one per three on two shifts, one per two on continuous three-shift running — and never fewer than two, to avoid a single point of failure.

Position Near the running route but off the main aisle, or a charging machine blocks the way.
Space Allow at least one and a half body lengths in front of the dock for approach and withdrawal.
Power Each charger needs its own 220 V supply with a sound earth.
High and low current Standard underride models use the JS-CHR-ACE5420-V and models over 2 tonnes the JS-CHR-ACE5450-V; high-current and low-current chargers must not be mixed.

Need the full engineering documents?

Site survey forms, recommended spare parts lists by model and battery transport documents are provided for each project. Tell us the model and the site, and we will send the latest version.

Request documents

SEE ALSO

All six handling series →  ·  Send your site conditions